Job Reference

PeriodProject NameMain ContractorScope of Work
May 2015 - Nov 2015 Contract No. HY/2012/08 - Tuen Mun-Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section - Remove of surcharge and TBM excavated material and disposal to Tuen Mun Area 38 Dragages Bouygues Joint Venture
  • Earthworks for excavation of surcharge mount and TBM materials,
  • disposal of excavated material by land and marine transportation to TM38 dump site
Aug 2013 - Feb 2016 Contract No. HY/2012/08 - Tuen Mun - Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section Dragages Bouygues Joint Venture
  • Construction of Northern landfill by reclamation of approximately 16.5 hectares
  • Construction of approximately 2 km of vertical seawall including dredging and disposal,installation of precast concrete seawall blocks
  • Struction works for capping beams and structing beams to launching shaft
  • Deep excavation of launching shaft of approximately 90,000 cu. metres of excavated materials
Dec 2013 - Nov 2015 Hopewell Centre II Development - Site Formation and Foundation Works China Overseas Building Construction Limited
  • Site formation and excavation of approximately 135,000 cu. metres of general material and rock
  • Associated slope protection works including soil nails, rock dowel, buttress wall and shotcrete
  • ELS tp pipe pile walls
Mar 2012 - 2014 ASD Contract No. SS W304 - Design and Construction of Trade & Industry Tower at kai Tak Development Area Dragages Hong Kong Ltd.
  • Site Setting Up & Site Hoarding
  • ELS and Sheet Piling
Mar 2012 - Aug 2013 MTRC Express Rail Link Contract 823B - Shek Kong Stabling Sidings & Emergency Resue Sidings Maeda - CSCEC Joint Venture
  • Excavation of Launching Shaft
Dec 2012 - May 2012 ASD Contract No. SS W303 - Design and Construction of Cruise Terminal Building and Ancillary Facilities for the Kai Tak Cruise Terminal Development Dragages Hong Kong Ltd.
  • Site Formation and Earthwork
  • ELS, Sheet Piling and Shoring System
  • Formwork and Concrete Placing to Ground Beams & Underground Structure
  • Underground Drainage & Utilities Works
  • Road Works & On Grade Slab
Dec 2010 - June 2012 MTRC Express Rail Link Contract 820 - Mei Lai Road to Hoi Ting Road Tunnel Dragages - Bouygues Joint Venture
  • Earthwork and Capping Beam Construction at Launch Shaft
  • Construction of Cofferdam to DSD Rising Main
  • Site Setup Works
Nov 2010 - May 2012 MTRC Contract 703 - MTRC West Island Line (SHW to SYP) Dragages - Maeda - BSG Joint Venture
  • Land transportation of surplus materials off site to designed barging facility
  • Construction of RC muck pit including sheet piling, excavation, formwork shuttering, steel fixing and concrete placing
June 2009 - Sept 2011 DSD Contract DC 2007/10 - Construction of Island West Drainage Tunnel Dragages - Nishimatsu Joint Venture
  • Land transportation of surplus materials off site to designed barging facility
Aug 2009 - May 2010 ASD Contract SS S313 - Design & Construction of New Civil Aviation Headquarters on Airport Island Dragages Hong Kong Ltd.
  • Temporary hoarding, site access and drainage works
  • Excavation for substructure, import filling, backfilling and disposal of excavated materials off site, and construction of soil nails
  • Formwork shuttering, supply & laying concrete to RC Structure
Mar 2007 - May 2009 Ocean Park Master Redevelopment Project (Contract No. CI05) Dragages (HK) Joint Venture
  • Excavation and lateral support for Funicular Tunnel
  • Deposition and compaction of general fill materials
  • Installation of sheet piling system
  • Conveyor Access and Platform Formation
  • Earthwork and Road Works
  • Drainage, Sewerage and Utility Diversion Works
  • Hoarding works at Waterfront PTI
  • Slop Stabilization Works
Sept 2006 - Dec 2006 SkyCity Marriott Hotel at Hong Kong International Airport Dragages Hong Kong Ltd.
  • Excavation Works for Substructure
  • Drainage and External Works
Dec 2002 - Jun 2006 KCRC Contract No. LDB201 - Sheung Shui to Chau Tau Tunnel Dragages (HK) Joint Venture
  • Site Formation, Excavation, Spoil Disposal and Backfilling Works
  • Backfilling works at Kwu Tung Area
  • Ground Treatment and Stabilization Works
  • River Channel Treatment
  • Drainage and External Works at Kwu Tung Area
  • RC Works including steel fixing, formwork shuttering & concrete placing
Dec 2003 - Mar 2004 International Exhibition Centre at Hong Kong International Airport Dragages (HK) Limited
  • Site Formation, Excavation and Backfilling Works
  • Earthwork for Substructure and Utility Tunnel
  • Road Works, Drainage and Other Utilities Works
Mar 2001 - Dec 2002 New TVB City at Tseung Kwan O Dragages et Travaux Publics (HK) Ltd.
  • Site Formation, Excavation, Spoil Disposal and Backfilling Works
  • Foundation and Road Modification Works
  • Slop Stabilization Works
May 1999 - Oct 2002 MTRC Contract 601 - Hang Hau Station & Tunnel Dragages et Travaux Publics (HK) Ltd.
  • Site Formation, Excavation, Spoil Disposal and Backfilling Works (Top – down method)
  • Underground Drainage diversion works
  • Subway and Retaining Walls
  • Civil Road Works